Index / Q3 2026 edition

Quarterly Cost Index

The same ten reference projects, priced mid-grade in every state. Location is the biggest lever after project size — this page measures exactly how big.

Verified 2026-09 · 10 projects · 50 states · HomeTrueCost

National snapshot — mid-grade pricing

ProjectReference specNational medianCheapest → priciest state
Roofing2,000 sqft 3-tab shingle, tear-off + replace$16,846$15,032 Arkansas$21,370 Illinois
Kitchen remodel120 sqft, mid-range cabinets + counters + appliances$51,782$45,885 Arkansas$66,119 Hawaii
Bathroom remodel60 sqft full bath, mid-range fixtures + tile$22,838$19,756 Arkansas$29,655 Hawaii
HVAC replacement3-ton central gas + AC swap, like-for-like$14,949$13,649 Arkansas$17,357 Alaska
Siding replacement1,800 sqft wall, vinyl lap$19,814$17,465 Arkansas$25,383 Hawaii
Deck build320 sqft pressure-treated, pro build$14,943$12,954 Arkansas$19,404 Hawaii
Driveway replacement600 sqft concrete 4in, tear-out + repour$8,780$7,730 Arkansas$11,312 Hawaii
House painting1,500 sqft interior walls, 2 coats contractor-grade$4,282$3,508 Alabama$5,860 Hawaii
Flooring800 sqft engineered hardwood installed$11,898$10,637 Arkansas$15,021 Hawaii
Window replacement10 vinyl double-hung openings, retrofit install$13,243$11,987 Arkansas$16,673 Hawaii

Mid-grade tier, June seasonal, default scope per project. Sources: BLS OEWS + BEA goods-RPP (2026-09-12).

Where location matters most

Full methodology, sources, and limitations · methodology

FAQ

What is the HomeTrueCost Cost Index?

A quarterly snapshot pricing the same ten reference projects across all fifty states — mid-grade tier, June seasonal — from BLS wage and BEA price data. It shows the national median and the cheapest-to-priciest state spread per project. A Canada tab prices three pilot projects across nine provinces in Canadian dollars.

Is the index a forecast?

No. It prices the current manifest vintage stated on the page — a measurement, not a prediction. Each edition is dated and archived in the changelog below.

Can I cite these figures?

Yes — cite the page URL plus its verified date. Every number derives from the documented base specs and the public methodology; Zonda Cost vs Value is used only as a calibration boundary and never reproduced.

Changelog

Estimate only — not professional advice.